138kV Line (Section 18729749)
Overview
138kV Line (Section 18729749) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Coelba. The mapped section is about 7.2 km long. It is located at about 14.606° S, 45.853° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Coelba
- Voltage
- 138 kV
- Mapped length
- 7.2 km
- Country
- Brazil
- Coordinates
- 14.606° S, 45.853° W
- Layer
- 138kV Lines
- Asset ID
- 18729749
More Attributes
- Cables
- 6
- Circuits
- 2
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line3.7 km
- 138kV Line4.2 km
- 138kV Line18 km
- 138kV Line19 km
- 138kV Line25 km