138kV Line (Section 18728609)
Overview
138kV Line (Section 18728609) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Coelba. The mapped section is about 8.8 km long. It is located at about 11.218° S, 40.511° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Coelba
- Voltage
- 138 kV
- Mapped length
- 8.8 km
- Country
- Brazil
- Coordinates
- 11.218° S, 40.511° W
- Layer
- 138kV Lines
- Asset ID
- 18728609
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line45 km
- 138kV Line91 km
- 138kV Line100 km
- 138kV Line100 km
- 138kV Line102 km