138kV Line (Section 18728599)
Overview
138kV Line (Section 18728599) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Coelba. The mapped section is about 51 km long. It is located at about 11.718° S, 45.607° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Coelba
- Voltage
- 138 kV
- Mapped length
- 51 km
- Country
- Brazil
- Coordinates
- 11.718° S, 45.607° W
- Layer
- 138kV Lines
- Asset ID
- 18728599
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line28 km
- 138kV Line38 km
- 138kV Line48 km
- 138kV Line51 km
- 138kV Line51 km