138kV Line (Section 18728397)
Overview
138kV Line (Section 18728397) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by CEMIG. The mapped section is about 15 km long. It is located at about 19.488° S, 44.141° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- CEMIG
- Voltage
- 138 kV
- Mapped length
- 15 km
- Country
- Brazil
- Coordinates
- 19.488° S, 44.141° W
- Layer
- 138kV Lines
- Asset ID
- 18728397
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line3.4 km
- 138kV Line6.4 km
- 138kV Line7 km
- 138kV Line7.2 km
- 138kV Line7.4 km