138kV Line (Section 18728366)
Overview
138kV Line (Section 18728366) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by CEMIG. The mapped section is about 9.8 km long. It is located at about 20.058° S, 44.620° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- CEMIG
- Voltage
- 138 kV
- Mapped length
- 9.8 km
- Country
- Brazil
- Coordinates
- 20.058° S, 44.620° W
- Layer
- 138kV Lines
- Asset ID
- 18728366
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line1.5 km
- 138kV Line1.8 km
- 138kV Line2.9 km
- 138kV Line11 km
- 138kV Line12 km