138kV Line (Section 18728363)
Overview
138kV Line (Section 18728363) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by CEMIG. The mapped section is about 34 km long. It is located at about 19.988° S, 44.934° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- CEMIG
- Voltage
- 138 kV
- Mapped length
- 34 km
- Country
- Brazil
- Coordinates
- 19.988° S, 44.934° W
- Layer
- 138kV Lines
- Asset ID
- 18728363
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line5.2 km
- 138kV Line15 km
- 138kV Line16 km
- 138kV Line16 km
- 138kV Line24 km