138kV Line (Section 18728313)
Overview
138kV Line (Section 18728313) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by CEMIG. The mapped section is about 18 km long. It is located at about 20.989° S, 44.854° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- CEMIG
- Voltage
- 138 kV
- Mapped length
- 18 km
- Country
- Brazil
- Coordinates
- 20.989° S, 44.854° W
- Layer
- 138kV Lines
- Asset ID
- 18728313
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line9.3 km
- 138kV Line10 km
- 138kV Line10 km
- 138kV Line21 km
- 138kV Line22 km