138kV Line (Section 18728306)
Overview
138kV Line (Section 18728306) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by CEMIG. The mapped section is about 18 km long. It is located at about 21.579° S, 45.644° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- CEMIG
- Voltage
- 138 kV
- Mapped length
- 18 km
- Country
- Brazil
- Coordinates
- 21.579° S, 45.644° W
- Layer
- 138kV Lines
- Asset ID
- 18728306
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line8.6 km
- 138kV Line15 km
- 138kV Line20 km
- 138kV Line21 km
- 138kV Line21 km