138kV Line (Section 18728303)
Overview
138kV Line (Section 18728303) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Cemig. The mapped section is about 4.1 km long. It is located at about 21.421° S, 45.981° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Cemig
- Voltage
- 138 kV
- Mapped length
- 4.1 km
- Country
- Brazil
- Coordinates
- 21.421° S, 45.981° W
- Layer
- 138kV Lines
- Asset ID
- 18728303
More Attributes
- Cables
- 6
- Circuits
- 2
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line1.9 km
- 138kV Line3.3 km
- 138kV Line13 km
- 138kV Line17 km
- 138kV Line30 km