138kV Line (Section 18728120)
Overview
138kV Line (Section 18728120) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Energisa MG. The mapped section is about 21 km long. It is located at about 21.397° S, 42.857° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Energisa MG
- Voltage
- 138 kV
- Mapped length
- 21 km
- Country
- Brazil
- Coordinates
- 21.397° S, 42.857° W
- Layer
- 138kV Lines
- Asset ID
- 18728120
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line8.1 km
- 138kV Line10 km
- 138kV Line11 km
- 138kV Line13 km
- 138kV Line13 km