138kV Line (Section 18728109)
Overview
138kV Line (Section 18728109) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Energisa MG. The mapped section is about 66 km long. It is located at about 20.519° S, 42.572° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Energisa MG
- Voltage
- 138 kV
- Mapped length
- 66 km
- Country
- Brazil
- Coordinates
- 20.519° S, 42.572° W
- Layer
- 138kV Lines
- Asset ID
- 18728109
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line21 km
- 138kV Line26 km
- 138kV Line29 km
- 138kV Line34 km
- 138kV Line39 km