138kV Line (Section 18728005)
Overview
138kV Line (Section 18728005) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Cemig. The mapped section is about 137 km long. It is located at about 17.133° S, 44.359° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Cemig
- Voltage
- 138 kV
- Mapped length
- 137 km
- Country
- Brazil
- Coordinates
- 17.133° S, 44.359° W
- Layer
- 138kV Lines
- Asset ID
- 18728005
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line1.8 km
- 138kV Line55 km
- 138kV Line57 km
- 138kV Line57 km
- 138kV Line57 km