138kV Line (Section 18724983)
Overview
138kV Line (Section 18724983) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by CEMIG. The mapped section is about 28 km long. It is located at about 20.027° S, 44.443° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- CEMIG
- Voltage
- 138 kV
- Mapped length
- 28 km
- Country
- Brazil
- Coordinates
- 20.027° S, 44.443° W
- Layer
- 138kV Lines
- Asset ID
- 18724983
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line1.2 km
- 138kV Line2.3 km
- 138kV Line2.3 km
- 138kV Line6.7 km
- 138kV Line9.3 km