Network Map
Loading the live map around Subestação Nova Mutum #18580281…

Subestação Nova Mutum #18580281

SubstationTaesa (Transmissora Aliança de Energia Elétrica)Brazil

Start Free

Overview

Subestação Nova Mutum #18580281 is a substation on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by ELETRONORTE - Centrais Elétricas do Norte do Brasil S.A. It is located at about 13.828° S, 56.076° W.

Key Facts

Type
Substation
Network
Taesa (Transmissora Aliança de Energia Elétrica)
Operator / Owner
ELETRONORTE - Centrais Elétricas do Norte do Brasil S.A
Country
Brazil
Coordinates
13.828° S, 56.076° W
Layer
Substations
Asset ID
18580281

More Attributes

Location
outdoor
Power
substation
Substation
transmission

Nearby Substations