Network Map
Loading the live map around Parque Solar Cura Brochero…

Parque Solar Cura Brochero

Power Station30 MWEPECCórdoba, Argentina

Start Free

Overview

Parque Solar Cura Brochero is a 30 MW power station on the EPEC network in Córdoba, Argentina. Technology: Solar PV - Fixed; status: In Service; operated by TBA. It is located at about 31.725° S, 65.039° W.

Key Facts

Type
Power Station
Network
EPEC
Operator / Owner
TBA
Capacity
30 MW
Technology
Solar PV - Fixed
Status
In Service
Region
Brazil
State / Province
Córdoba
Country
Argentina
Coordinates
31.725° S, 65.039° W
Layer
Power Stations
Asset ID
16377355

More Attributes

Asset Type
Existing Plant
Fuel Type
Solar - Solar
Number of Units
1.0
Lower Nameplate Capacity (MW)
30.0
Upper Nameplate Capacity (MW)
30.0
Aggregated Lower Nameplate Capacity (MW)
30.0
Aggregated Upper Nameplate Capacity (MW)
30.0
Dispatch Type
NS