poste 225/60 KV de Mibladen
Overview
poste 225/60 KV de Mibladen is a 225 / 60 kV substation on the Sonelgaz network in Bordj Bou Arréridj, Algeria. It is located at about 32.761° N, 4.644° W.
Key Facts
- Type
- Substation
- Network
- Sonelgaz
- Voltage
- 225 / 60 kV
- State / Province
- Bordj Bou Arréridj
- Country
- Algeria
- Coordinates
- 32.761° N, 4.644° W
- Layer
- Substations
- Asset ID
- 18159813
More Attributes
- Location
- outdoor
- Power
- substation
- Substation
- transmission
Nearby Substations
- Midelt Wind Farid5.5 km
- Network Substation13 km
- Network Substation14 km
- Poste Ksabi24 km
- Network Substation27 km