Cherrywood to Richview C4R;C5R
Overview
Cherrywood to Richview C4R;C5R is a 230 kV line on the Toronto HydroElectric System Limited network in Ontario, Canada. Operated by Hydro One. The mapped section is about 9.5 km long. It is located at about 43.761° N, 79.516° W.
Key Facts
- Type
- Line
- Network
- Toronto HydroElectric System Limited
- Operator / Owner
- Hydro One
- Voltage
- 230 kV
- Mapped length
- 9.5 km
- State / Province
- Ontario
- Country
- Canada
- Coordinates
- 43.761° N, 79.516° W
- Reference
- C4R;C5R
- Layer
- 230kV Lines
- Asset ID
- 18745234
More Attributes
- Power
- line
Nearby Lines
- Cherrywood to Richview1.1 km
- 230kV Line1.5 km
- 230kV Line1.6 km
- 230kV Line1.7 km
- 230kV Line1.7 km