33kV Line 464/1
Overview
33kV Line 464/1 is a 33 kV line on the TNSP Projects network in Australia. Operated by Endeavour Energy. The mapped section is about 3.9 km long. It is located at about 33.782° S, 150.708° E.
Key Facts
- Type
- Line
- Network
- TNSP Projects
- Operator / Owner
- Endeavour Energy
- Voltage
- 33 kV
- Mapped length
- 3.9 km
- Country
- Australia
- Coordinates
- 33.782° S, 150.708° E
- Reference
- 464/1
- Layer
- 33kV Lines
- Asset ID
- 18657489
More Attributes
- Power
- line
Nearby Lines
- 33kV Line2.7 km
- 33kV Line4.4 km
- 33kV Line6.7 km
- 450 Blacktown TS to Newton ZS18 km
- 450 Blacktown TS to Newton ZS19 km