Aldoga BESS Stage 1
Overview
Aldoga BESS Stage 1 is a 200 MW energy project on the Generation network in Australia. Technology: Storage - Battery; status: Anticipated; operated by Acciona Energy Australia Global. It is located at about 23.822° S, 151.070° E.
Key Facts
- Type
- Energy Project
- Network
- Generation
- Operator / Owner
- Acciona Energy Australia Global
- Capacity
- 200 MW
- Storage
- 400 MWh
- Technology
- Storage - Battery
- Status
- Anticipated
- Commissioned
- 2025-11-01
- Region
- QLD1
- Country
- Australia
- Coordinates
- 23.822° S, 151.070° E
- Layer
- Proposed QLD
- Asset ID
- 8432217
More Attributes
- Asset Type
- Project
- Fuel Type
- Other - Other
- Number of Units
- 1.0
- Lower Nameplate Capacity (MW)
- 200.0
- Upper Nameplate Capacity (MW)
- 400.0
- Aggregated Lower Nameplate Capacity (MW)
- 200.0
- Aggregated Upper Nameplate Capacity (MW)
- 400
- Dispatch Type
- S