Network Map
Loading the live map around Territory Battery…

Territory Battery

Energy Project0.5 MWGenerationAustralia

Start Free

Overview

Territory Battery is a 0.5 MW energy project on the Generation network in Australia. Technology: Storage - Battery; status: Publicly Announced; operated by Neoen Australia Pty Ltd. It is located at about 35.249° S, 148.981° E.

Key Facts

Type
Energy Project
Network
Generation
Operator / Owner
Neoen Australia Pty Ltd
Capacity
0.5 MW
Storage
400 MWh
Technology
Storage - Battery
Status
Publicly Announced
Region
NSW1
Country
Australia
Coordinates
35.249° S, 148.981° E
Layer
Proposed NSW
Asset ID
8433148

More Attributes

Asset Type
Project
Fuel Type
Other - Other
Number of Units
1.0
Lower Nameplate Capacity (MW)
0.5
Upper Nameplate Capacity (MW)
200.0
Aggregated Lower Nameplate Capacity (MW)
0.5
Aggregated Upper Nameplate Capacity (MW)
200
Dispatch Type
S

Nearby Energy Projects