2097 Helton Solar Project
Overview
2097 Helton Solar Project is a 1.5 MW power station on the City of Modesto network in California, United States. Technology: Solar Photovoltaic; operated by Solarenewal LLC. It is located at about 37.352° N, 120.507° W.
Key Facts
- Type
- Power Station
- Network
- City of Modesto
- Operator / Owner
- Solarenewal LLC
- Capacity
- 1.5 MW
- Technology
- Solar Photovoltaic
- Region
- California
- State / Province
- California
- Country
- United States
- Coordinates
- 37.352° N, 120.507° W
- Layer
- Power Stations
- Asset ID
- 38126980
More Attributes
- Plant Name
- 2097 Helton Solar Project
- City
- Merced
- County
- Merced
- Primary Energy Source
- solar
- Energy Sources
- Solar = 1.5 MW
- Net Summer Capacity (MW)
- 1.5
- EIA Plant ID
- 58920
- Sector
- IPP Non-CHP
Nearby Power Stations
- UC Merced Solar Hybrid6.8 km
- Broadway 3 - UC Merced 16.8 km
- Merced Solar LLC9.6 km
- Mission Solar LLC9.6 km
- City of Atwater NEM14 km