Network Map
Loading the live map around Aproveitamento Hidroelétrico dos Coucinhos…

Aproveitamento Hidroelétrico dos Coucinhos

Power Station3 MWCastelo Branco, Portugal

Start Free

Overview

Aproveitamento Hidroelétrico dos Coucinhos is a 3 MW power station in Castelo Branco, Portugal. Technology: Hydro - Dam; status: In Service; operated by TBA. It is located at about 40.272° N, 7.619° W.

Key Facts

Type
Power Station
Operator / Owner
TBA
Capacity
3 MW
Technology
Hydro - Dam
Status
In Service
Region
Portugal
State / Province
Castelo Branco
Country
Portugal
Coordinates
40.272° N, 7.619° W
Layer
Power Stations
Asset ID
16368764

More Attributes

Asset Type
Existing Plant
Fuel Type
Hydro - Hydro
Number of Units
1.0
Lower Nameplate Capacity (MW)
3.0
Upper Nameplate Capacity (MW)
3.0
Aggregated Lower Nameplate Capacity (MW)
3.0
Aggregated Upper Nameplate Capacity (MW)
3.0
Dispatch Type
NS

Nearby Power Stations