Network Map
Loading the live map around Braybrook Zone Substation - Essendon Zone Substation (BY-ES)…

Braybrook Zone Substation - Essendon Zone Substation (BY-ES)

Line66 kVJemenaVictoria, Australia

Start Free

Overview

Braybrook Zone Substation - Essendon Zone Substation (BY-ES) is a 66 kV line on the Jemena network in Victoria, Australia. The mapped section is about 5.4 km long. It is located at about 37.769° S, 144.890° E.

Key Facts

Type
Line
Network
Jemena
Voltage
66 kV
Mapped length
5.4 km
State / Province
Victoria
Country
Australia
Coordinates
37.769° S, 144.890° E
Layer
66kV Lines 2022
Asset ID
314171

Nearby Lines